Spread Centres first places all openings, then spaces studs in each panel (between openings) and individual opening cripple studs evenly at nearest under entered Max Centres.
Each panel and opening will have different stud centres (depending on its width), evenly spread at nearest to under entered Max Centres.
If you don't need to join sheeting over exactly placed stud centres, or exactly align trusses or rafters with studs, Equal Spacing spreads the studs evenly,
resulting in smaller centres, less studs, and preventing multiple closely spaced or adjacent studs.
With Exact Centres some opening edge studs may overlap common studs. To maintain centres, if the overlapped studs are not completely covered,
the common stud position is adjusted (moved left or right). If the opening edge studs cover all but a small portion of the common stud (the Tolerance)
the common stud is removed. No need to add a stud if the existing opening edge stud is only off by a few mm (the Tolerance).
With
Colour Code checked:
Adjusted studs are Blue
Common (un-adjusted) studs are Red
Opening studs are Orange
Adjust scale of diagrams to measure 100% scale on screen with a ruler.
Scale